Scan to Download Gate App
qrCode
More Download Options
Don't remind me again today

Microsoft just revised their power deficit forecast upward to 47 gigawatts. To put that in perspective? That's equivalent to adding one full-scale nuclear reactor to the grid every single week.



The scale here is staggering. We're watching a tech giant essentially admit they're racing ahead of infrastructure capacity. This isn't just about flipping switches—it's about the raw energy demands of next-gen computing, whether that's AI training clusters or decentralized networks.

When major players start talking in nuclear-plant-sized units, you know the energy equation for digital infrastructure is hitting a breaking point. The gap between innovation velocity and power grid reality keeps widening.
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • 7
  • Repost
  • Share
Comment
0/400
faded_wojak.ethvip
· 14h ago
The established pattern of Electric Tiger has collapsed.
View OriginalReply0
LiquidityWitchvip
· 19h ago
Large Investors are here.
View OriginalReply0
DataChiefvip
· 12-02 04:43
Microsoft is playing big, the future is too exciting.
View OriginalReply0
CodeZeroBasisvip
· 12-02 04:43
Energy consumption forecasting is frightening.
View OriginalReply0
UncommonNPCvip
· 12-02 04:38
The energy consumption demand is a bit frightening.
View OriginalReply0
Ser_Liquidatedvip
· 12-02 04:33
The power banks are not enough.
View OriginalReply0
NeonCollectorvip
· 12-02 04:28
Insufficient production capacity has constrained.
View OriginalReply0
  • Pin
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)